Pay in 4 interest-free payments of $10.99 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 31 - Sep 5
Pay in 4 interest-free payments of $10.99 Learn more
Ships within 48 hours · Estimated delivery Aug 31 - Sep 5
The Central Alloy Division is located in Massillon
spinning frame
Incorporation located at 102 Coit Street
YTB1A12C29
This is an original 1955 two-color
1915 Print Switchboard Stave Falls Development Power House Interior Canada XGPC8 SC2 The Central Alloy Division isThis is an original 1915 duotone halftone print of the switchboard at the Stave Falls Power House from the Stave Falls Development in British Columbia, Canada. Stave Lake is a hydroelectric reservoir in the Stave River System near Vancouver. It was dammed in the 1920s and two large cement dam, a powerhouse, bunkhouses, a community hall and railway were created as a part of the Stave Falls Power Company. CONDITION This 96+ year old Item is rated Near
US$ 49.99
US$ 99.95
US$ 13.00
US$ 44.99